Petroleum Production Engineering

 

Oil production Engineering -1

 

[FIRST Semester 2018-2019]

Instructor Information

Instructor

Email

Office Location & Hours

[Edmon Salloum]

[Edmon Salloum@spu.edu.sy]

[Allaeeck, 10-16, Satady]

 

 

 

General Information

Course Description

Oil production Engineering -1 interested Many subjects which considered main establishment for oil production technology as preparation well to produce and penetrate production zoon to install down hole Equipmentes ,peroration methods , lifting operations , the main theoretical items to lift liquids through Tubing in addition to Natural flow and its Equipments and problems ,Intermittent continuous Gas lift Method .   

A maximum of 5 lines.

Expectations and Goals

A maximum of 5 goals

1-    Transfer the main information for student to know about system operation ( Zoon- Well-surface facilities .

2-    Transfer the main information for student to know how to select type of production ( Natural flow- Artificial lift )

3-    Transfer knowledge for student to know the main issues about natural flow and required equipments

4-    Transfer knowledge for student to know the main issues about gas lift method and required equipments .

5-    The main problems and challenges during natural flow and gas lift operation , How to control and deal with .

Language(s) of Instruction:                    Textbook(s) Language(s)

Course Materials

Required Text

[Item Name] [Media Type], [Author Name]

[Item Name] [Media Type], [Author Name]

Course Schedule

 

 

Week

Topic

Reading

Exercises

1

the week 1       

physical specification for liquid zoon

4-13

 

2

the week 2

prepair well for production

14-28

 

3

the week 3

Therd week prepair well for production

29-35

 

4

the week 4

lifting operation for oil wells

29-35

 

5

the week 5

Thearitical issues to lift fluids through tubing

36-54

 

6

the week 6

theoretical issues to lift fluids through tubing

55-64

 

7

the week 7

basic of natural flow and there conditions

65-79

 

8

the week 8

natural flow operation calculations

80-99

 

9

the week 9

Natural flow problems

100-149

 

10 

the week 10

Gas lift systems

150-163

 

11

the week 11

week Gas lift well operations

170-178

 

12 

the week 12

Gas lift valves ,calculate depth

179-209

 

13

the week 13

week artificial lift ,Intermittent Gas lift , plunger lifting

210-226

 

14

the week 14

week plunger Gas lift equipments and calculations

227-242

 

15

 

 

 

 

Testing Schedule

test

Date

Subject

Reading

Type

language

% of final grade

Quizz 1

29/10

Lecture 1-5

All

written

Arabic

5

Quizz 2

10/12

Lecture 6-10

All

written

Arabic

5

Practical examination

 

 

23/12

 

Exs

 

written

Arabic

30

 

 

final exam

16/1/2019

Lecture 1-10

All

written

Arabic

60

                         

General notes:

-       ….

-       ….

 

-       ….

Attachement Files

Syrian Private University - Petrol Engineering @ 2024 by Syrian Monster - Web Service Provider | All Rights Reserved